For Folks who like Free Reeded Instruments. Those who wish to see my reviews of instruments and what projects are going on in the shop.
Thursday, 22 March 2012
Repeatability, accuracy, and repeatability
Getting the machine to give me an accurate reading is one thing. Getting to do it after running code and rapids is another. Tuning stepper motors for those who don't know is a balance between steps/unit (mm for me), velocity (fastest the machine is to go), and acceleration (how fast it gets there). Just ordered some additional measuring tools to try to get the last bit of accuracy I need out of the machine to do parts I have designed. This is where the demand of accuracy and precession get time consuming and more then a bit nerve racking. The pay off when it is all done is going to be worth it but getting there can take a bit of time.
Tuesday, 13 March 2012
Two steps forward...
Well making progress on the wiring and set up of the machine and also making progress on getting g-code and everything set up for cutting a good number of pieces. As always seems the case there is one or two that just do not want to go right and wiring issues that need looking at in finer detail. So working on that, which is slowing work down and added to that, been getting sick again which is not good.
But hey got cutting started and getting things moving in the right direction.
But hey got cutting started and getting things moving in the right direction.
Thursday, 1 March 2012
The little things
Well progress on the new Gantry Router is going well, though the little things keep getting things slowed down. Which would bother me if it was not for the fact that progress is being made and can be measured. design work is going well and will begetting the upper bed (the part that is expected to get scared and damaged on Monday. Which means I can focus on getting the homing switches and the probe set up over the weekend. Which in turn will make monday afternoon so much easier for set up.
On other fronts Health is getting better and should be back up tuning soon (chromatics) work will be resuming on the Harmonetta front shortly on design and testing of parts (one of the reasons that the new machine was being built). Concertina design is going well and will be setting up to cut out end plates in the near future as well.
So all in all good reasons for thanks and praise.
On other fronts Health is getting better and should be back up tuning soon (chromatics) work will be resuming on the Harmonetta front shortly on design and testing of parts (one of the reasons that the new machine was being built). Concertina design is going well and will be setting up to cut out end plates in the near future as well.
So all in all good reasons for thanks and praise.
Monday, 20 February 2012
Well Time to get this and other projects moving forward
Sorry folks about being a dead blog for a good while. Much has happened since last Blog. Have a new Gantry Router due to the old one not meeting tolerances after annual maintenance and the new one took longer to get built then expected (not due to lack of trying on anyones part just the way it happened).
I am at the moment wiring up the new machine and am happy to also have a Distributorship for parts with Hohner (Special thanks to Steve at Sutherland Music and Michael Timler at Hohner). Also have had fun learning the new CAD software that I was able to get (ViaCAD 2D3D v8) and it really rocks and lets me get models exactly as I need them to set up G-code. Also learning CamBam to hopefully replace BobCAD as my main CAM software.
Been very busy and things look good. Only problem is chest cold that is just not going away.
I am at the moment wiring up the new machine and am happy to also have a Distributorship for parts with Hohner (Special thanks to Steve at Sutherland Music and Michael Timler at Hohner). Also have had fun learning the new CAD software that I was able to get (ViaCAD 2D3D v8) and it really rocks and lets me get models exactly as I need them to set up G-code. Also learning CamBam to hopefully replace BobCAD as my main CAM software.
Been very busy and things look good. Only problem is chest cold that is just not going away.
Tuesday, 5 July 2011
Fun, fun, fun
Was able to afford a Hohner 268 (an extended bass harmonica from E1 to C4 in range) and have been restoring/repairing it as well as working on a clients harmonica and another clients Hohner Verde VS. Things are going pretty well all in all. Hope you folks are having a great day.
Wednesday, 8 June 2011
Here We Go
Well first post and working on getting the website fully up as well as the web-store. Looking to get a some arrangements of music up as well. Hoping that folks enjoy. Will also be getting pictures of projects up and how to posts up as I am able. Hope everyone is having a great day.
Subscribe to:
Posts (Atom)