Thursday 1 March 2012

The little things

Well progress on the new Gantry Router is going well, though the little things keep getting things slowed down. Which would bother me if it was not for the fact that progress is being made and can be measured. design work is going well and will begetting the upper bed (the part that is expected to get scared and damaged on Monday. Which means I can focus on getting the homing switches and the probe set up over the weekend. Which in turn will make monday afternoon so much easier for set up.

On other fronts Health is getting better and should be back up tuning soon (chromatics) work will be resuming on the Harmonetta front shortly on design and testing of parts (one of the reasons that the new machine was being built). Concertina design is going well and will be setting up to cut out end plates in the near future as well.

So all in all good reasons for thanks and praise.

No comments:

Post a Comment